One document to prove everything is in order, at all times
A complete electrical file is essential for any resale, regularization, or inspection. It includes all the elements necessary to prove that your installation is RGIE-compliant: single-line diagrams, position plans, analysis of external influences, inspection reports, certificates of conformity, photos, quotes, and interventions. At Bativolt, we create this file for you, even if the installation is old or has never been inspected. You will receive a structured, readable PDF, which can be used by any approved organization or notary.

Diagrams & plans
Single-line diagram, position diagram, circuit numbering, legend: everything is up to date and compliant.

RGIE analysis
External influences, location, type of building and public: the environment is assessed and recorded.

Reports & Certificates
Diagnostic report, certificate of conformity, inspection sheet: everything is attached, signed, and ready to present.

Digital format
The file is submitted in PDF format, readable on a computer or mobile device, archived or easily transmitted to the notary or controller.

A well-structured technical file avoids refusals, blockages... and unpleasant surprises.
At Bativolt, we create a complete, usable and RGIE-compliant electrical file for you. This document includes all the elements necessary for validating your installation: single-line diagram, position plan , analysis of external influences , certificate of conformity, technical reports, photos, any comments and monitoring sheet. This file is essential in the event of an inspection, resale, future intervention or dispute. It allows you to prove at any time that your installation has been designed, corrected or regularized in accordance with the rules. It is provided in digital PDF format, readable on all media, and can be used directly by inspection bodies or by a notary during a sale. Even if your installation is old, has never been inspected or has no original plan, we reconstruct everything, piece by piece, and deliver a file ready to defend your compliance. This is not a luxury: it is a necessity.
A well-constructed file means undeniable compliance.
RGIE electrical compliance
All required elements are present, standardized and accepted by the inspection bodies without return or comment.
Clear & structured
Each section of the file is legible, numbered, and includes a caption, photo, and annotation. Even a third party can easily use it.
Legal evidence
In the event of a dispute, sale or inspection, the file proves that your installation was compliant at a given time. This is your guarantee.

Complete, clear and validated files without discussion
At Bativolt, we've prepared hundreds of complete electrical files, submitted to private clients, property managers, and businesses. They are accepted without comment by inspectors, notaries, and audit firms. Each file is archivable, reusable, and, above all, usable in the event of a dispute or inspection.
+3000
Files written
+30%
In industrial
100%
Successful compliances
Your questions about the complete electrical file and its RGIE compliance
Understand what a complete file contains, why it is essential and how it protects your installation and your procedures.
It is required for resale, RGIE inspection, regularization, or any compliance. It may also be requested by a notary, insurance company, or public body.
Single-line diagram, position diagram, analysis of external influences, diagnostic report, RGIE certificate, quotes, invoices, photos, comments and technical monitoring sheet.
Yes. Even without a diagram or initial document, we can recreate everything from what already exists: identification, inspection, diagrams, analysis, etc.
Yes, if it is accompanied by a technically compliant installation. Our files are validated without return by all approved organizations.
Yes. It is in PDF format, clear, readable, and usable by a notary, a buyer, another service provider, or an inspection body.
Everything you need to know about the creation, usefulness and validation of a complete electrical file
Ils ont sécurisé leur conformité grâce à un dossier technique complet et structuré
I needed a complete file to sell my property. Bativolt took care of everything: diagrams, report, analysis. The notary approved everything without discussion.
Stephanie R., Uccle
The inspector asked me for the complete file. Bativolt put it together in 3 days, a clear, compliant file, with all the necessary documents.
Damien V., Schaerbeek
As a property manager, I often receive complaints about the lack of documentation. Now I work with Bativolt, and I know that everything is tracked and validated.